23 Oct 04 - Elevator Pushrods and Bellcrank


Mission for today: let's finish priming the pushrods since I didn't do that great a job trying to prime them in the dark, pull and buck the rivets for those, and work on the bellcrank that connects the two elevator pushrods. Not one of the most exciting project days, but hey - we're still getting stuff done.


P1013213.JPG
Match drilled with the spacer fabricated.
P1013214.JPG
Completed pushrods.
P1013215.JPG
Primed and clecoed bellcrank. We'll rivet it tomorrow.



Previous log entry


Back to the log


Next log entry