9june05


Today we'll work on the flush mounting brackets for the Dynon, and see if we can get those into the panel. We should be able to get the clock in, too.


P6090230.JPG
Brackets for the Dynons - nutplates in there, ready to go.
P6090234.JPG
Clock is in there now.
P6090237.JPG
Panel at the end of the evening.

Pretty exciting to actually get instruments in the panel, even if it is temporary. Probably this is a smaller milestone than it feels like. In any case, it looks like there's going to be a lot of work to get all the instruments in there, even temporarily. Probably it'll be easier to do that sort of work before we get the panel in the fuselage, so we'll probably keep at this for a bit.




Previous log entry


Back to the log


Next log entry